- Inspect buildings or infrastructure to determine level of hazards
- Check alignment with local fire codes, Saudi Arabian SBC 801/2015 standards and international norms (NFPA, ISO).
- Collaborate with Turbosan and Valveseal to assess compatibility of existing systems with their equipment
Services
1-Site Survey
Full Project Study
- Create technical plans for fire networks (sprinklers, hydrants, gas-based suppression)
- Using Turbosan pumps and Valveseal valves as core components.
- Run fire spread models and calculations to ensure water/foam coverage meets NFPA flow
rates. - Provide a breakdown of equipment costs (e.g., Turbosan pumps), installation labor, and
lifecycle maintenance.
Supply, Install, and Commissioning of Fire Network
- Due to our skilled team we are more than capable of getting the work done and always a few steps ahead.
- The first step is to supply of the equipments. Additionally the second step Installation of the firefighting network, Deploy pipes, sprinklers, detectors, and control panels according to the project study, then the last step is commissioning and this involves the following:
- Pressure-test pipes and valves.
- Conduct live drills to test alarm triggers, pump activation, and sprinkler response.
- Train facility staff
Reliable After-Sales Service
- Maintenance Contracts: Scheduled inspections of pumps, valves, and alarms to prevent failures.
- 24/7 Emergency Support: Rapid response teams in Egypt and Saudi Arabia to fix leaks, pump failures, or false alarms.
- Spare Parts Supply: Direct access to Turbosan and Valveseal components for quick replacements.